STECON Electromechanical Contracting Private Limited Pakistan has done an Agreement with Abdullah Al. Albarak & Sons (Kingdom of Saudi Arabia for the recruitment of Manpower from Pakistan, dated 26 Jaunray 2013 to 25 January 2015.

PETROMEN

United Arab Emirates

STECON UAE is working in Takreer Refinery expansion project with our partners Petromen Contracting - Daewoo E&C Abudhabi
 

 

CLIENT. M/A Daewoo E&C  Korea
SUB CONTRACTOR. PETROMEN LLC
STECON ELECTROMECHANICAL CONTRACTING LLC

 

Scope of Work: Piping fabrication and erection works refinery expansion project

 

United Arab Emirates

Tabreed

DCP AD-05,
DISTRICT WATER COOLING PLANT
BAINOUNA  ABU DHABI
CLIENT. TABREED CONTRACTOR BELHASA Projects LLC
SUB CONTRACTOR. TECHNOSTAR LLC
STECON ELECTROMECHANICAL CONTRACTING LLC, MASTER ELECTROMECHANICAL LLC

DESCRIPTION:

11 KV , 3.3 KV AND 0.44 KV SWITCHGEAR PANELS, MCC PANELS, SOFT STARTERS, DISTRIBUTION BOARDS, TRANSFORMERS,CABLE TRAY / LADDER / CONDUITS, POWER & CONTROL CABLES PULLING & TERMINATIONS. TIE-IN AND COMMISSIONING.

SYNERGY

Sultanat Of Oman

Kingdom of Saudi Arabia

TOLEDO

Agreement done between Synergy Petroliume International Muscat, Oman  and Stecon Electromechanical Contracting in October 2012 for the skill manpower supply to Synergy Oman

​

Stecon Supply 98 Persons to Synergy Oman at very short periode of Mobilizaton for 4 month Project.

interviews conducted at 14th and 15th October 2012 and 98 persons selected in different crafts as under mentioned

 

QA QC Inspector, Welding Inspector, Mechanical Supervisor, Millwright Supervisor, Millwright, Fabricator, Fitter, Electrician, Welder Multi



Above mentioned all crafts arranged by Stecon.



Agreement done between Toledo Arabia / Arabian Pipelines and Stecon Electromechanical Contracting in April 2013, for the skill manpower supply to Toledo Arabia KSA.

​

116 Technical Persons are ready to Mobilize from Pakistan for Toledo Arabia Kingdom of Saudi Arabia,

interviews conducted at 13th and 14th April 2013 and 116 persons selected in different crafts as under mentioned

Mechanical Forman, 
Piping Forman, Piping Chargehand, ï»¿E&I Forman, E&I Chargehand, Drivers,

Crane Operator, Instrument Technicians, Fabricator, Multi welders 6G, Electrician, ï»¿Pipe Fitter

 

Above mentioned crafts are arranged by Stecon and all crafts are being mobilize as soon as.



United Arab Emirates

GPEC

Agreement done between GLOBAL PACIFIC ENGINEERING & CONTRACTING L.L.C and STECON ELECTROMECHANICAL CONTRACTING L.L.C ABUDHABI in May 2013, 

​

Project: Water Supply Syetem for FUJAIRAH Distribution Network Lot B & C 
 

​Scope of Work:

​

Unloading of pipes from trailers, laying of pipes in trenches, Fabrictaion Works, Fit ups and welding of CS Pipeline.

​

Stecon is going to Arrange the neccessary qualified manpower, Tools & tackels, Welding Machines and Equipements, PPE's Consumeables to carry out works related to the scope of project.

United Arab Emirates

Entraco

Agreement done between PAL TECHNOOGIES and STECON ELECTROMECHANICAL CONTRACTING L.L.C ABUDHABI in May 2013, 

​

Project: YAS ISLAND POLICE STATION, ABUDHABI 
 

​Scope of Work:

​

Welding works for HOT Tapping of Chilled Water Network.

​

Stecon will prepare the mathode statements, fabrication and erechion of 10" Pipe spools for bath supply and return lines by qualified welders with NDT, Hydro testing of piping at site.

we are only a phone call away

PAK: +92-42-35942557

UAE: +971-555-106119

© 2013 by STECON  Electromechanical Contracting Pvt, Ltd. All rights reserved.

bottom of page